栃木県宇都宮市、鹿沼市、真岡市、壬生町、栃木市、小山市の、不用品回収、部屋片付け、遺品整理は便利屋アーカディアへ!

アーカディア ご相談センター 0120-47-2851

千葉県の便利屋アーカディアで廃品回収・不用品回収

便利屋アーカディア作業風景へ

Lt Agreement Tangedco

Possible article:

Understanding the LT Agreement with TANGEDCO for Industrial Power Consumers

If you are a large or medium-sized industry in Tamil Nadu that requires high levels of electricity for your operations, you need to have a special type of agreement with the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) called the Low Tension (LT) Agreement. This agreement is necessary to ensure a reliable and efficient supply of power to your facility, as well as to comply with legal and safety requirements.

In this article, we will explain the key features and benefits of the LT Agreement with TANGEDCO, the process of obtaining and renewing it, and some tips on how to optimize your power consumption and costs under this scheme.

What is the LT Agreement with TANGEDCO?

The LT Agreement is a contract between TANGEDCO and an industrial power consumer who needs a continuous and uninterrupted supply of electricity at a voltage level of 240/415 volts. This type of voltage is considered low tension as it is below the threshold of 1,000 volts that defines high tension (HT) supply. The LT Agreement covers a range of power tariffs, from 110 kW to 10,000 kW, and can be customized to suit the specific needs of the consumer.

Some of the key features of the LT Agreement are:

– The supply of power is based on a fixed monthly demand charge and a variable energy charge, both of which are calculated based on the agreed tariff rate and the actual consumption of the consumer.

– The supply is subject to a maximum demand limit, which is the highest instantaneous power drawn by the consumer during a billing cycle. If the consumer exceeds this limit, a penalty charge is applied based on the excess demand and the tariff rate.

– The supply is subject to a power factor penalty, which is a measure of the efficiency of the consumer`s electrical system in converting the input power to useful output power. If the power factor falls below a minimum threshold, a penalty charge is applied based on the shortfall and the tariff rate.

– The supply is governed by the rules and regulations of the Electricity Act, 2003, and other relevant laws and codes. The consumer has to comply with safety and quality norms, such as providing proper earthing, installing protective devices, and maintaining the electrical equipment in good condition.

What are the benefits of the LT Agreement with TANGEDCO?

The LT Agreement offers several advantages to the industrial power consumer, such as:

– A reliable and uninterrupted supply of power at a stable voltage level, which is essential for maintaining the quality and productivity of the industrial processes.

– A transparent and predictable billing system, which helps the consumer to plan and control their energy expenses and avoid any surprises or disputes.

– A flexible and scalable tariff structure, which allows the consumer to choose the most suitable rate for their consumption pattern and adjust it as per their operational needs.

– A simplified and streamlined process of obtaining and renewing the agreement, which saves time and effort for the consumer and reduces the risk of non-compliance or penalties.

How to obtain and renew the LT Agreement with TANGEDCO?

To apply for the LT Agreement, the consumer has to submit a set of documents to the local TANGEDCO office, such as:

– Proof of identity and address of the authorized signatory of the consumer.

– Proof of ownership or lease of the premises where the power is consumed.

– A copy of the sanctioned load and the electrical diagram of the consumer`s installation.

– A copy of the latest electricity bill or the NOC from the previous supplier, if applicable.

– Any other documents or certificates as required by TANGEDCO.

Once the application is processed and verified, TANGEDCO will issue the LT Agreement with a validity period of 5 years. The agreement can be renewed by submitting a renewal application at least 30 days before the expiry date and paying the prescribed fee. If the consumer wants to modify or transfer the agreement, they have to follow the relevant procedures and pay the applicable charges.

Tips for optimizing power consumption and costs under the LT Agreement with TANGEDCO

To make the most of the LT Agreement, the industrial power consumer can adopt some best practices for power management, such as:

– Install energy-efficient equipment and lighting systems that reduce the demand for power and increase the power factor.

– Monitor and control the power consumption by using smart meters, sensors, and automation systems that detect and rectify the wastage or leakage of power.

– Shift the power-intensive operations to off-peak hours when the tariff rates are lower, and avoid or reduce the use of power during peak hours when the rates are higher.

– Participate in TANGEDCO`s demand response programs that incentivize the consumers to reduce their power demand during grid emergencies or overload situations.

– Conduct regular audits and inspections of the electrical installations and ensure compliance with safety and quality norms to prevent accidents, downtime, and penalties.

In conclusion, the LT Agreement with TANGEDCO is a vital arrangement that ensures a reliable and efficient supply of power to industrial consumers in Tamil Nadu. By understanding the key features and benefits of this scheme and optimizing their power consumption and costs, the industrial consumers can improve their competitiveness, productivity, and sustainability.